Double Lane, Ramp Closures On I-96 In Brighton Area Monday
August 23, 2023
![Double Lane, Ramp Closures On I-96 In Brighton Area Monday](/dbphotos/displaywidth/2b6779b0690425cb565ed2393a6b706b/600/a.jpg)
Jessica Mathews / news@whmi.com
Motorists should brace for a double-lane freeway and ramp closure next week in the Brighton area.
A double-lane closure is scheduled on eastbound I-96 at Grand River, exit 145.
The closure is scheduled to be in effect on Monday, from roughly 9am to 4pm.
Additionally, the eastbound Grand River ramp to eastbound I-96 will also be closed. That ramp closure will also be in effect from 9am to 4pm on Monday.
Delays should be expected and alternate routes are advised.